供应商机
首页 > 供应商机 > DJS-II/C价格 标称放电电流5KA残压1KV
电压35kv 电流100A 质保一年 认证CCC 材质防触电
ABB避雷器放电记录仪--上海伽豪自动化随时欢迎您的来电查询,如需选型请及时来电,希望合作愉快!
Scope of application: 3 ~ 35kV system discrete lightning arrester without (with Series) gap; 2. Power supply: AC / DC 110 ~ 220V, < 1.5W;3. Counting form: A, B and C phases are counted separately and displayed on centralized LCD; 4. Minimum capture discharge current: < 10A; 5. Minimum capture pulse width: < 1 μ s; 6. Leakage current monitoring range: 0 ~ 20mA; 7. Built in clock, power failure holding time: half a year; 8. Storage capacity: > 2000 pieces;  9. Communication interface: 485, class Modbus protocol; 10. Independent address code can be set
DJS-II/C价格
Long press the "F" key, then "CLR" will prompt whether all counts are cleared, and "-" will be displayed. After a "-" appears  Execute the reset operation, and release the "F" key to exit before a "-" appears; 5. After pressing "▲" and "▼" at the same time to enter the setting state, the "year" bit flashes first, which can be adjusted by up and down keys; adopt Short touch "F" to switch to "month", "day", "hour", "minute" and "second" in sequence. When the second adjustment is over, short touch "F" to display the address code of the counter. If adjustment is needed, press "▲" and "▼" to adjust, and the adjustment will take effect immediately; During the adjustment, if the operation stops at any position for more than 7S, the standby state will be restored automatically, and the previous adjustment is effective. 6. Relevant data can be managed by background software through 485 bus;
DJS-II/C价格
Data can be downloaded and analyzed with special software through mobile computer and 485-232 transfer interface. Overall dimension, installation method and wiring diagram  Overall dimension
DJS-II/C价格
Method of use1. Connect the corresponding wiring according to the operation manual; 2. When powered on, the LCD is displayed in turn according to the sequence of phase a counting, phase B counting and phase C counting;  3. Short touch the "F" key to check phase a count, phase B count, phase C count, local address, current date and current address in turn Time, when the current time is displayed, if it is djs-ii type, press the "F" key three times to zero the leakage current value (please pull out the data cable during zero calibration).
使用方法 按照操作手册连接相应的接线;2.通电时,LCD按a相计数、B相计数、C相计数顺序依次显示;短“F”键,依次检查a相计数、B相计数、C相计数、本地地址、当前日期和当前地  时间,当显示当前时间时,如果是djs ii型,按“F”键三次,将泄漏电流值归零(归零校准时请拔出数据电缆)。

DJS-II/C价格